PROPOSITION C
HIGH SCHOOL RENOVATIONS
1ST FLOOR
2ND FLOOR
Click images to enlarge
Update furniture, finishes, lighting and code compliance
Paint all classrooms on second floor
Removal of lockers to recapture unused space for instruction
Renovations of Library
Projected Completion Date of August 2025
PHASE 1
Repurpose existing “hall locker space at main circulation space
Create collaboration spaces and redistribute classroom
Renovate existing restrooms, including fixtures and finishes
Replace/repair ceiling tile and grid at collaboration spaces.
PHASE 2
Update all finishes in classrooms
Replace / repair ceiling tile and grid system
Replace ceiling in Library and Cafeteria spaces
Adjust classroom sizes if needed
Replace older casework in science labs and work room areas
Replace carpet in circulation areas
Renovate Library
Replace lighting with LED in renovated areas
UPDATE FURNITURE
Modern furniture allows for more student collaboration and hands-on learning.
RECAPTURE UNUSED SPACE FOR INSTRUCTION