PROPOSITION C

HIGH SCHOOL RENOVATIONS

1ST FLOOR

2ND FLOOR

Click images to enlarge

  • Update furniture, finishes, lighting and code compliance

  • Paint all classrooms on second floor

  • Removal of lockers to recapture unused space for instruction

  • Renovations of Library

  • Projected Completion Date of August 2025

PHASE 1

  • Repurpose existing “hall locker space at main circulation space

  • Create collaboration spaces and redistribute classroom

  • Renovate existing restrooms, including fixtures and finishes

  • Replace/repair ceiling tile and grid at collaboration spaces.

PHASE 2

  • Update all finishes in classrooms

  • Replace / repair ceiling tile and grid system

  • Replace ceiling in Library and Cafeteria spaces

  • Adjust classroom sizes if needed

  • Replace older casework in science labs and work room areas

  • Replace carpet in circulation areas

  • Renovate Library

  • Replace lighting with LED in renovated areas

UPDATE FURNITURE

Modern furniture allows for more student collaboration and hands-on learning.

RECAPTURE UNUSED SPACE FOR INSTRUCTION